Winter AKA “Before Baby” To-Do List

Yep, a few things on our list have changed in priority due to the impending arrival of Baby H. I love doing these lists because they really help me stay accountable to Future Cathy, who is notoriously hard to please. We managed to get most of our Spring/Summer list done, with the exception of the sunroom, which I didn’t think we’d get to til next year anyway. Honestly, I’m just so glad we got the foundation done!

Here’s what I’m hoping to get done before the end of February (fingers crossed Baby H doesn’t decide to come any sooner):

  1. Finish the nursery. Obviously, we need somewhere to put that baby. We are most of the way there, or at least we have all the furniture. I still need to do all the requisite organizing of baby clothes and hang pictures on the wall, but we’re making progress! Check out my post on our plans for the nursery for more details. I’m particularly loving this corner and have been trying out that rocker already! As you can see, we’re still deciding on a paint colour for the accent wall.IMG_5112
  2. Work on the back entrance. Now that our kitchen floors are done, it has put into sharper focus how truly terrible the back entrance is. We’ve been using it as our main entrance while we wait on redoing our landscaping- we don’t have a path leading to our front steps any more (come to think of it, we don’t have front steps period at the moment) and due to Richmond’s lovely clay based soil, this leads to an obscene amount of mud being tracked in the house- so we’re using the back door until we figure that situation out. Luckily (ha) all the snow we just got has covered up the entire mess of our lawn so we can pretend it doesn’t exist until April-ish. I’ve already ripped up the old carpet, which has reduced the old person smell drastically! The paint colour will be the same as our hallway and the trim will just get a fresh coat of white paint. We’ll probably continue the vinyl tile from the kitchen here, maybe with painting the steps and risers.CPZY1511
  3. Shoe moulding. Seriously, for real this time. After ripping up the carpet in our living room/dining room and laying the new tile in the kitchen, this is the last step we have to finish the floors off in that half of the house, and somehow it keeps getting pushed back by other stuff. It’s the kind of thing you can ignore for a long time and as soon as you notice it again you’re like “Hmm. This looks really crappy and we should change that. But wait, let me do this other thing first…” and repeat 10x.
  4. Floors in the hallway. After we discovered the hardwood didn’t continue down the hall like we had hoped, my husband ripped up the vinyl flooring that was underneath the old carpet and the first layer of subfloor as well. Since then we’ve been living with it and it’s annoyingly shabby looking, and is really affecting my selfie game. Plus those different levels and rough wood won’t be so kind on sweet little baby hands and knees. We want to try to match the hardwood in the living room and hopefully the transition won’t be too obvious.
    IMG_4898
  5. Touch up paint. Ugh, but I don’t want to. Our carpet installation messed up some of the pain paint (haha, I just Freudian slipped that) in the hallways and bedroom trim, so that needs to be touched up. Also, one wall of the kitchen never got a 2nd coat of paint and it’s kind of obvious in certain light. Plus there are just spots that I didn’t do the world’s best paint job on initially.
  6. Basement plans. Now that the foundation waterproofing is ♫ALL DONE♫ (sing it with me!) we can start to think about how we want to plan out the space- all 1100 square feet of it. It’s entirely unfinished so it’s a beautiful blank slate for us. Our plans will most likely include at least one bedroom, enclosing the laundry room and adding a toilet/shower there for a second bathroom, walling in a family room/rec room, and figuring out some sort of extra pantry storage area. Part of the basement will also remain unfinished for tools and general storage.

And that is probably enough to keep us busy! Realistically this will probably take us into the Spring as well, I’m sure I’ll find the time with a newborn baby… I hear all they do is sleep and poop, right?

If you’re wondering why you haven’t heard anything lately about our bathroom reno, it’s because we decided to put it on the back burner for now. Although it’s hideously ugly in all its green, bronze, floral-wallpapered glory, it is functional. And it’s our only bathroom. Our strategy going forward is to rough in a second bathroom downstairs before we start any work on our bathroom, now that we have firsthand experience about how not-fun not having water is from our foundation well water line shenanigans.

Stay tuned for my progress!
-C

Spring/Summer To-Do List

This worked so well for the winter that I thought I’d do it again! I love making lists, and the satisfaction I get from crossing stuff off of it motivates me just enough to keep going. Our summer is going to be mostly taken up by digging up and water proofing our foundation, which is pretty much the least exciting thing ever to blog about. So I might be kind of quiet here in the coming weeks, and will mostly be busy digging, moving plants, and making sandwiches for the horde of people helping us.

Here’s what I’m hoping to get done, in between resting my sore back. I reserve the right to add, subtract, or modify at will.

  1. Put the finishing touches on the kitchen. Do you recall from my One Room Challenge reveal post that our flooring didn’t come in on time? It actually came in the day after the ORC deadline. *shakes fist* Just imagine how good this will look with charcoal grey rectangular tiles!One Room Challenge Kitchen Dear DIYWe also need to install the last light fixture and order our new fridge, which we are super stoked about. A new fridge was not in our reno budget this year but my parents offered to foot the bill because they’re awesome (and would like somewhere to put a champagne bottle that dispenses ice when they come over).
  2. Finish our master bedroom. Now that our carpets are installed, our room just needs some pictures on the walls and the closet doors back up. Bonus points if we manage to find a new bed frame- I’m on the lookout for something with straight lines, but we haven’t decided yet if we will buy or DIY.
  3. Hem the curtains in the guest room and set it up for actual guests (not just my cat). No, you’re not experiencing déjà vu, this just never got done on my Winter list. It’s even worse now since we got the carpets installed, because everything had to come out of there and we had to take apart the bed to get it out the door, so that is currently in pieces in the middle of the floor with the mattress leaned up against the wall. Not an ideal sleeping position! I’d actually really like to have some sort of a desk station inside the closet where I can store all my sewing stuff. My mom always had her sewing desk inside a closet and it worked really well, for both organization and hiding the mess when you need to!
    closet sewing station

  4. Bring my style board to life in the living room and install window treatments- yup, this got bumped from the Winter list, too! One of my neighbors “casually” mentioned that she noticed we don’t have curtains up yet- welcome to small town Ontario! I love all the natural light that comes in since tearing down the old curtains but I’d like to put something up that will give us a bit of privacy without compromising the light too much. I really love the look of a natural woven fiber blind with white panels and will probably go that route.
  5. Restain the solid maple dresser I scored off Kijiji last year. My husband has been using a horrible small MDF dresser since I have known him (2007). His boxers and undershirts have to be folded in a specific way to fit inside it and it drives be bananas! I’m going to stain it with leftover Special Walnut stain from my dresser makeover.DSC_1622_
  6. This will probably get bumped off the priority list and might only get done next summer… but I’d love to do something with our sunroom. Right now it’s full of stuff that we moved out of the bedrooms during the carpet installation, but we’ve got our old sectional sofa in there along with a cute little table that I found at the ReStore and it has the potential to be awesome. It would be a great space to enjoy an afternoon nap or a cold drink- I can imagine euchre tournaments and board games happening here with friends.sunroom_bright

The one great thing about having a long list of stuff to do is that I can pick and choose what I want to work on, depending on my mood and productivity level! It really is amazing how much work there is to do around the house- any house, not just ours. I’m grateful that we only have 1100 square feet of space because we already spend so much time just cleaning and maintaining it, let along the time it takes to do all the projects we want to do!

Hope you come along for the ride,

-C

My Winter To-Do List

Christmas is in 5 sleeps and I have 2 more work days until 1.5 weeks vacation! I am really looking forward to some time off, and time spent with family. I’ve had some health problems lately that have caused a lot of emotional and physical stress so I am totally due for a break! Looking around the house, there is a ton of stuff that hasn’t been getting done, mostly due to the aforementioned health problems. When I feel crappy, all I want to do is camp on our new sofa and watch Gilmore Girls (thanks Netflix!).

jess rory

Stop being so dreamy, Jess.

I’ve been baking like crazy too… it’s like therapy for me. Cookies, brownies, gingerbread, shortbread, chocolate bark, cakes, cupcakes… it’s been out of control. My husband was actually complaining that I’m baking too much. The other night I was in the kitchen and he actually said “Are you done baking yet?!” and it wasn’t because he wanted to eat the cookies.

baking
Recipes: Espresso brownies | Candy cane chocolate bark | Rum cake

But it’s time to pull myself out of the funk I’ve been in and get back to work. As much as I still love our house, I am starting to realize why people buy brand new houses that need zero work; it kind of sucks living in a house full of half-started renovations! I was chatting to my mother-in-law and she said something that I’ve been thinking about. I had mentioned how we hadn’t put any pictures up in the house because it’s just another thing to dust, and we are generating a lot of dust while we work on various things. She laughed and said but then you’ll start the kitchen… and then the basement… and then something else. She’s right- I’m tired of living in limbo. Our basement is full of half-unpacked boxes that get opened when we need something (and can remember which box it went in…). We have pretty much only unpacked the essentials, like our furniture, kitchen stuff, and clothes. Realistically, it’s going to be 3-5 years before the big stuff like the bathroom, kitchen, and basement are tackled. I don’t want to wait that long to hang up the reclaimed wood picture frames we got as a wedding present from my family in South Africa!

gallery wall vignette with reclaimed wood picture frames

Reclaimed wood frame gallery wall

You know we are currently working on our plans for the bathroom– we’ve been to showrooms and have pretty much decided on the type of vanity and tub we want, we just need to commit to one and get it home so we can start knocking walls down. A lot of this will get done by my husband and maybe a friend or two if he does some arm-twisting. I’ll probably be helping more with the tiling, painting, and finishing touches than sledgehammer wielding and pipe installing, so here’s what I’m going to aim to get done this winter:

  1. Third bedroom: finish sanding and patching the holes left from the wallpaper removal, paint the walls and trim, and rip up the carpet.
  2. Kitchen: patch the walls, paint trim and walls.
  3. Guest bedroom: hem the curtains, put some pictures up and get it “guest ready” so we stop using it exclusively as a laundry storage room.
  4. Living room: touch up some of the paint, figure out window treatments, organize the front closet with a shoe rack, install the wall-mount for the TV above the fireplace, work on my shame shelf (I need to hang up the mail organizer that is still leaning against the wall… my shame has multiplied), and figure out what to do with this piece of furniture that came with the house.media playerWe can’t seem to find the right spot for it. It’s an audio cabinet that has a record player and radio player with built-in speakers. I wanted to turn the front wood panels into doors somehow with shelving for extra crockery and maybe a liquor cabinet?? But maybe we should just sell it on Kijiji.
  5. Master bedroom: finish hanging curtains, find a chair for the corner for the cat to sleep on as an accent piece.

Aaaand if I get all of that done, I’m definitely going to deserve the trip to Florida that I am still working on convincing my husband we should take! Are you suffering from winter hibernation yet? Want to motivate me to get started at all? Leave a comment below!

signature 6